Home › Quality › Factory Audit Support
Quality

Factory Audit Support for Customers Sourcing from China

An audit is easier to pass when the documents already exist. We host customer and third-party audits at our plant in Shenzhen, prepare the documentation packet before the audit date, and answer findings in writing with a correction date.

Request a Quote
Scope

What an auditor walks through

The shop floor

Milling, turning, Swiss-type and 5-axis cells, with the machines your parts actually run on — not a showroom.

The metrology room

Zeiss SPECTRUM CMM and spark-OES spectrometers, with their calibration status on the file.

Records, part by part

Material certificates, dimensional reports and first-article records pulled for the part numbers in scope.

Packing

Packing done in an ISO Class 7 cleanroom environment, with the packing list matched to the inspection record.

Machining cells on the ProtoTech shop floor in Shenzhen
Machining cells on the shop floor — what an auditor walks through
Metrology equipment in the ProtoTech measuring room
The metrology room: CMM and gauges, with calibration status on file
Documents

The documentation packet

Certificates and scope

ISO 9001:2015 and IATF 16949:2016 certificates with their scope statements, so the auditor can see what is covered and what is not.

Calibration records

Calibration status for the CMM and for the hand gauges used on your parts.

Material and inspection records

EN 10204 3.1 material certificates and dimensional inspection reports for the part numbers in scope.

Corrective action file

Findings from earlier audits and complaints, with the correction taken and the date it closed.

What we are — and what we are not

We are not a certification body and we do not issue ISO certificates. What we can do is put your auditor in front of a plant that is ready to be audited, and a document trail that matches what is standing on the floor. If a finding is fair, we say so and fix it; if the scope of a certificate does not cover your part, we say that too, before the audit rather than during it.

Process

Before, during and after the audit

1

Before

Scope, dates and the document list are agreed; the packet is assembled and checked against that list.

2

During

Plant tour, records review and interviews; we sit in and answer for the process.

3

After

Every finding gets a written response with an owner and a date, and the file stays open until it is closed.

4

Follow-up

The closed actions are kept with the part records, so the next audit starts from evidence rather than memory.

FAQ

Frequently asked questions

Yes. Customer auditors and third-party certification bodies are both hosted at the plant. Give us the date and the document list in advance so the packet is ready.
Yes — AENOR RA02-0022/2022 (IATF 0444369), valid to 22 March 2028. The scope is LIDAR metal housings and metal eyewear frames, and it excludes product design. If your part falls outside that scope, ISO 9001:2015 applies.
Yes. Certificates, calibration records and sample inspection reports can be sent before the audit date under NDA.
Each finding is answered in writing with the correction taken and a completion date, and the response is sent to you rather than kept internally.
We can sit in on a process review at another supplier's plant in China and report what we see. We do not issue audit certificates or act as a certification body.
Start a project

Request a Quote

Tell us about your program. The fields below help our engineering team prioritize recurring, long-term supply programs with equipment manufacturers.

What happens after you send your files

  • Within 1 business day an engineer — not a salesperson — reviews your drawings and replies.
  • DFM review: tolerances, material and risk flags, before any cutting begins.
  • Your quote includes a material-verification plan: grade, EN/DIN check, certificate strategy.

Critical features are verified in house · material chemistry confirmed by spectrometer · EN 10204 3.1 certificates available.

Prefer email? Write to us directly at info@prototech-machining.com

Recurring programs and orders of 1,000+ pcs are prioritised by our engineering team.
The number of parts per order — it lets us price tooling and batch setup correctly instead of guessing at a range.
Several different parts? Email your list and drawings to ellie@prototech-machining.com and we will quote them together.
e.g. 120 pcs · 6061-T6 aluminium · black anodise · mates with bracket PT-1042
Your files stay yours.
Drawings and CAD files are used only to quote and manufacture your parts. They are not shared with third parties, and we sign an NDA on request — even before you send anything.
Built for qualified programs.
Our form captures production type, annual quantity and project status up front — so we can focus engineering resources on long-term supply relationships, not one-off inquiries.
Need engineering input first?
Talk to our team about special materials, tolerances or a failed-supplier recovery before you send drawings.
↑