Quality Assurance & Inspection
Inspection is a process, not a final gate. Every critical dimension is measured, documented and traceable to the batch — under an ISO 9001:2015 quality system.
CMM Inspection
Dimensional verification on a temperature-controlled Zeiss CMM.
View →First Article Inspection
Full FAI reports for new or revised parts.
View →Material Verification
Material grade verified before and after machining.
View →Material Certificates
EN 10204 3.1 mill certificates with every batch.
View →Traceability
Full batch traceability from stock to shipment.
View →Dimensional Inspection
Critical dimensions measured and reported.
View →Surface Finish Inspection
Roughness measured where specified.
View →Inspection Reports
Reports that support your incoming inspection.
View →Packaging
Kit, ESD-safe and cleanroom packaging.
View →Quality Documentation
Certificates, reports and audit support.
View →Drawing Revision Control
Always working to the released revision.
View →Certifications
ISO 9001 by GICG and IATF 16949 by AENOR, with numbers and validity.
View →Frequently asked questions
Request a Quote
Tell us about your program. The fields below help our engineering team prioritize recurring, long-term supply programs with equipment manufacturers.
What happens after you send your files
- Within 1 business day an engineer — not a salesperson — reviews your drawings and replies.
- DFM review: tolerances, material and risk flags, before any cutting begins.
- Your quote includes a material-verification plan: grade, EN/DIN check, certificate strategy.
Critical features are verified in house · material chemistry confirmed by spectrometer · EN 10204 3.1 certificates available.
Prefer email? Write to us directly at info@prototech-machining.com
Our form captures production type, annual quantity and project status up front — so we can focus engineering resources on long-term supply relationships, not one-off inquiries.
Talk to our team about special materials, tolerances or a failed-supplier recovery before you send drawings.