Home › Resources
Engineering Resource Center

Engineering Resource Center

Practical guides from the shop floor: how we hold tolerances, control burrs, manage stress and choose materials for parts that are hard to machine.

Request a Quote

CNC Tolerances: What Is Achievable

What precision machining holds and what drives cost.

View →

3-Axis vs 5-Axis Machining

How to choose between the two processes.

View →

CNC Turning vs Swiss-Type

Which process fits slender or chunky parts.

View →

DFM for CNC Machining

Design rules that remove cost before quoting.

View →

Machining Kovar

Process controls for glass-sealing components.

View →

CMM Inspection

How critical dimensions are verified.

View →

Machining PEEK: The 5 Hard Problems

Process controls for burrs, heat and dimensional drift.

View →

Machining Kovar

Process controls for glass-sealing components.

View →

Machining Tungsten

High-density alloys and how to cut them.

View →

Machining PVDF

Chemical-resistant fluoropolymer parts.

View →

Machining PTFE

Soft, inert and awkward to hold to size.

View →

5-Axis Machining Guide

When five-axis pays off and how to prepare a part.

View →

Surface Finish Guide

What Ra means and what determines finish.

View →

Tight Tolerance Guide

The process behind a repeatable tight tolerance.

View →

Machining Cost Factors

What actually drives the price of a part.

View →

FAI Guide

Process, report and acceptance before series.

View →

Material Certificates

EN 10204 3.1 explained and what to request.

View →

Parts for Machine Builders

Structural, motion and interface parts.

View →

Parts for Automation

Wear-resistant, repeatable components.

View →

Parts for Robotics

Stiff, light structural and joint parts.

View →

Machining Alumina Ceramic

Diamond grinding of hard, brittle parts.

View →

Machining Graphite

Why dry machining and dust control matter.

View →

Parts Gallery

Photographs of parts machined at our plant.

View →

Technical Glossary

EN/DE/CN glossary of machining and metrology terms.

View →
Explore more
FAQ

Frequently asked questions

Guides on CNC tolerances, machining cost factors, material selection, DFM review, 3-axis versus 5-axis, CNC turning versus Swiss-type turning, CMM inspection, first article inspection, material certificates, surface finish and guides for individual materials including PEEK, Kovar, tungsten, PVDF, PTFE, alumina ceramic and graphite.
Yes. They are written for engineers who need the reasoning behind a decision, not to gate a enquiry.
Yes - 83 photographed parts machined at the Shenzhen plant, each captioned with its material, surface finish and form.
It explains the terms that come up in specifications and enquiries - tolerance grades, datums, runout, surface finish, burrs and more - in English, German and Chinese.
Yes. The cost factors guide sets out what actually moves a quote: material, feature count, tolerance, setup, batch size, inspection and documentation.
Start a project

Request a Quote

Tell us about your program. The fields below help our engineering team prioritize recurring, long-term supply programs with equipment manufacturers.

What happens after you send your files

  • Within 1 business day an engineer — not a salesperson — reviews your drawings and replies.
  • DFM review: tolerances, material and risk flags, before any cutting begins.
  • Your quote includes a material-verification plan: grade, EN/DIN check, certificate strategy.

Critical features are verified in house · material chemistry confirmed by spectrometer · EN 10204 3.1 certificates available.

Prefer email? Write to us directly at info@prototech-machining.com

Recurring programs and orders of 1,000+ pcs are prioritised by our engineering team.
The number of parts per order — it lets us price tooling and batch setup correctly instead of guessing at a range.
Several different parts? Email your list and drawings to ellie@prototech-machining.com and we will quote them together.
e.g. 120 pcs · 6061-T6 aluminium · black anodise · mates with bracket PT-1042
Built for qualified programs.
Our form captures production type, annual quantity and project status up front — so we can focus engineering resources on long-term supply relationships, not one-off inquiries.
Need engineering input first?
Talk to our team about special materials, tolerances or a failed-supplier recovery before you send drawings.
↑