Assembly and Sub-Assembly for Equipment Components
Machined parts do not have to arrive as a box of loose components. We build sub-assemblies and bench assemblies, check fit and alignment before packing, and ship one part number with one inspection record — so the fitting work moves off your line and onto ours.
What we assemble
Frames and structures
Machined frames, brackets and plates joined and squared on the bench, with hole patterns checked against the mating part.
Rings, housings and inserts
Rings, housings and machined inserts fitted with the hardware your bill of materials calls for.
Fitting and fastening
Fasteners installed to your BOM and checked for presence and engagement before packing, part by part.
Sub-assembly as one item
A multi-part-number build becomes one item: one carton, one packing list, one inspection record.
What it changes on your line
Assembly hours leave your line
Bench work that eats a day of a fitter's time is done here, checked and documented, before the crate is closed.
A fit problem surfaces here, not there
If two parts do not go together, we find out in Shenzhen while both are still on our floor — not on your line with a delivery date at risk.
One record instead of many
The inspection record covers the assembly, not only the individual components that went into it.
Scope — and what we hand back
Mechanical assembly is what we do: fitting, fastening, alignment, insert installation and the checks that go with them. What we do not do is electrical wiring, electronics integration, software flashing or functional testing against your product specification — those stay with you or with a specialist. If an assembly needs them, we say so at quotation rather than discover it at packing.
How an assembly project runs
BOM review
Your bill of materials, the drawings and the mating part are reviewed together. Missing hardware is flagged before the build, not during it.
Trial build
The first assembly is built and checked against the mating part; if a fixture or a shim is needed, it is made here.
Assembly
Fitting, fastening and alignment, with the checks recorded as they happen.
Packing
Protective packaging for a finished assembly, not for loose parts: the item that arrives is the item that was checked.
Frequently asked questions
Request a Quote
Tell us about your program. The fields below help our engineering team prioritize recurring, long-term supply programs with equipment manufacturers.
What happens after you send your files
- Within 1 business day an engineer — not a salesperson — reviews your drawings and replies.
- DFM review: tolerances, material and risk flags, before any cutting begins.
- Your quote includes a material-verification plan: grade, EN/DIN check, certificate strategy.
Critical features are verified in house · material chemistry confirmed by spectrometer · EN 10204 3.1 certificates available.
Prefer email? Write to us directly at info@prototech-machining.com
Drawings and CAD files are used only to quote and manufacture your parts. They are not shared with third parties, and we sign an NDA on request — even before you send anything.
Our form captures production type, annual quantity and project status up front — so we can focus engineering resources on long-term supply relationships, not one-off inquiries.
Talk to our team about special materials, tolerances or a failed-supplier recovery before you send drawings.